Friday, April 07, 2017

[Cobra] 2017-04-02: STATE OF MISSION REPORT MARCH 2017

Below is the monthly report from Cobra for the Resistance Movement. Report for February 2017 is also included below for reference.

Explanation of some of the codes based on Cobra's previous blog posts can be found in the following link:
http://theeventhub2015.blogspot.co.uk/2016/08/history-in-making-series-collection-of.html

Source: http://2012portal.blogspot.co.uk/2017/04/state-of-mission-report-march-2017.html

------------------------------------------------
STATE OF MISSION REPORT MARCH 2017

Pandora in progress, EELA in progress. Drastic Systems/Isidic security breach, in deflection. HVBN substable to stable. M minimum requirements met, Midas packages.
 
STATE OF MISSION REPORT FEBRUARY 2017

Pandora in progress, EELA in progress. Sublunar CHIF/DF/DF detected, removal in progress. LL layers removal in progress, LSIP monitoring active, GR+ achieved. Drastic Systems/Isidic security breach, in deflection. HVBN substable to stable. M minimum requirements met.

No comments:

Post a Comment