Monday, July 03, 2017

[Cobra] 2017-07-02: STATE OF MISSION REPORT JUNE 2017

Below is the monthly report from Cobra for the Resistance Movement. Report for May 2017 is also included below for reference.

Explanation of some of the codes based on Cobra's previous blog posts can be found in the following link:
http://theeventhub2015.blogspot.co.uk/2016/08/history-in-making-series-collection-of.html

Source: http://2012portal.blogspot.co.uk/2017/07/state-of-mission-report-june-2017.html

---------------------------------------------------
STATE OF MISSION REPORT JUNE 2017

Pandora in progress, EELA in progress, BSMOSS/BSR sequence in progress. Systems/Isidic security breach deflection in progress, red alert at 504. PB removal attempt in progress. HVBN stable. M minimum requirements met.

STATE OF MISSION REPORT MAY 2017

Pandora in progress, EELA in progress, BSMOSS sequence in progress. Systems/Isidic security breach deflection in progress, red alert at 504. HVBN stable. M minimum requirements met.

No comments:

Post a Comment