Below is the monthly report from Cobra for the Resistance Movement. Report for July 2017 is also included below for reference.
Explanation of some of the codes based on Cobra's previous blog posts can be found in the following link:
http://theeventhub2015.blogspot.co.uk/2016/08/history-in-making-series-collection-of.html
Based on the recent update from Cobra, it can be assumed that BS stands of Black Stone, which has now been removed!
Reference: http://2012portal.blogspot.co.uk/2017/07/short-situation-update.html
Source: http://2012portal.blogspot.co.uk/2017/09/state-of-mission-report-august-2017_1.html
-----------------------------------------------------------------------------------
STATE OF MISSION REPORT AUGUST 2017
Pandora in progress, EELA in progress, GR+, BS clear, B96 detected. Systems/Isidic security breach deflection in progress, red alert at 504. PB removal attempt in progress, drastic PB/PPN security breach. HVBN stable. M minimum requirements met.
STATE OF MISSION REPORT JULY 2017
Pandora in progress, EELA in progress, MacroBS sequence completed. Systems/Isidic security breach deflection in progress, red alert at 504. PB removal attempt in progress, drastic PB/PPN security breach. HVBN stable. M minimum requirements met.
Thank you for all the information show us
ReplyDeleteYou are the man cobra, gracias amigo!