Below is the monthly report from Cobra for the Resistance Movement. Report for November is also included here for reference.
Explanation of some of the codes based on Cobra's previous blog posts can be found in the following link:
http://theeventhub2015.blogspot.co.uk/2016/08/history-in-making-series-collection-of.html
Source:
http://2012portal.blogspot.co.uk/2017/01/state-of-mission-report-december-2016.html
----------------------------------------------------------------------------
STATE OF MISSION REPORT DECEMBER 2016
Pandora in progress, EELA in progress, ATLANTIS12 clear, TOPAZ and ZEOLITE in progress, RR8 complete. Systems/Isidic security breach. HVBN substable to stable. M minimum requirements met.
STATE OF MISSION REPORT NOVEMBER 2016
Pandora in progress, EELA in progress. Systems/Isidic security breach, HVBN substable to stable. M minimum requirements met.
No comments:
Post a Comment